Laboratory
01/02
Analytical controls
Constant checks are performed at the service of both the conduction of the galvanic plants, through the verification of raw materials and galvanic solutions concentrations, and of the company's legislative compliance with the verification of the correct functionality of the waste water treatment plant.
Analytical controls
02/02
Quality controls
The finished parts are tested with the help of a fully renovated machines fleet all of which are ACCREDIA certificated. Climatic tests can be performed with and without relative humidity, corrosion resistance test using the CASS method (Cupro Acetic Salt Solution). The determination of thicknesses of galvanic coating, microdiscontinuity and potential difference are performed with the coulometric method.
Quality controls